<sub id="fqtpj"><sub id="fqtpj"></sub></sub>
<ins id="fqtpj"></ins>
<samp id="fqtpj"></samp>
<samp id="fqtpj"><ruby id="fqtpj"></ruby></samp>
<samp id="fqtpj"></samp>
<ins id="fqtpj"><ruby id="fqtpj"></ruby></ins>
<samp id="fqtpj"><ruby id="fqtpj"></ruby></samp>
<ins id="fqtpj"></ins>
<ins id="fqtpj"><ruby id="fqtpj"><button id="fqtpj"></button></ruby></ins>
<ins id="fqtpj"></ins>
<samp id="fqtpj"></samp>
<samp id="fqtpj"></samp>
<samp id="fqtpj"><ruby id="fqtpj"></ruby></samp>
<ins id="fqtpj"><ruby id="fqtpj"><legend id="fqtpj"></legend></ruby></ins>
<ins id="fqtpj"><button id="fqtpj"><pre id="fqtpj"></pre></button></ins>
<ins id="fqtpj"></ins>
<ins id="fqtpj"><ruby id="fqtpj"></ruby></ins>
<samp id="fqtpj"><ruby id="fqtpj"><legend id="fqtpj"></legend></ruby></samp>
Welcome to Dongguan Lisheng Electromechanical Equipment Co., Ltd.

? Hotline:400-8385-889
News

Hotline:400-8385-889
Tel:0769-85656916
Wang:Sheng 13751350708
Chuang:Sheng 13712951855
Fax:86-0769-85656926
E-mail:ls@dglisheng.com
Website:www.bitekeji.cn
Room 203, No. 45, Lianma Road, Dalingshan Town, Dongguan City  
FAQ
How can an enterprise improve its production efficiency? How should it optimize its assembly line?
Visit:4582 Date:2019-07-11
Optimize the operation time of the first station of the assembly line, and how long to put a board, which is the investment time necessary to meet the production plan. But in fact, the operation time of the bottleneck station is inevitably larger than the first station. The first station must not be the bottleneck station, so the first station may not be fully invested according to the required time, because the bottleneck station has slowed down his speed. Therefore, from the perspective of management, it is necessary to require the first station operator to invest at the prescribed speed. The conveyor belt speed of the assembly line can also be used to calculate the daily output. The following is the formula for the conveyor belt speed:

Pitch time of the conveyor belt = working time / daily output of the whole day * (1 + non-performing rate)

Conveyor speed = mark separation distance / pitch time of the conveyor belt

The so-called mark separation distance, the distance between the marks made on the belt of the pipeline, the operator is expected to complete the work according to the speed at which the mark flows and placed on the belt line, but the refining line is not marked, the length of the board is used. As the mark separation distance. Why use a conveyor belt?

In addition to transporting items, there are also semi-mandatory operators who perform the functions of the work according to the plan, but instead of speeding up the trial, they should be calculated according to the above formula.

Links
Dongguan Lisheng Electromechanical Equipment Co., Ltd.    Dongguan Lisheng Electromechanical Equipment Co., Ltd. 
Home | Assemblyline | 智能分揀吊掛系統 | Products | Successful cases | News | About Us | Contact Us |

Hotline: 400-8385-889
Tel:0769-85656916
Wang:Sheng 13751350708
Chuang:Sheng 13712951855
Fax: 86-0769-85656926
E-mail:ls@dglisheng.com
Website: www.bitekeji.cn
Add:Room 203, No. 45, Lianma Road, Dalingshan Town, Dongguan City

Alibaba

Wechat
CopyRight ? 2019 Dongguan Lisheng Electromechanical Equipment Co., Ltd. All Right Reserved. 粵ICP備17115331號
展開(kāi)
  • QQ咨詢(xún)

  • 電話(huà)咨詢(xún)

  • 400-8385-889
QR CODE
回到頂部 亚洲精品欧美综合久久,无码人妻久久一区二区三区蜜桃,久久99国产精品成人,国语自产精品视频在线第 GOGOGO免费高清看中国国语| 国产免费一区二区视频| 精品久久久国产一区二区| 在线观看国内精品视频| 2020年国产精品| 2022久久国产精品免费热麻豆| AV一区二区三区高清久久| 99这里只有精品| 国产精品1区2区| 国产精品WWW夜色视频|